31st July 2010

drapeau françaisFrançais

Return results:

Lastest News:

New Office!
Offering you even more flexability and presence, Groupe-Inspectas opens a new office in Donges, West of France.

Quick Links:

Groupe Inspectas

Rue Jean Huré B.P.43

76580 LE TRAIT

Tel.02.35.05.57.70

Fax.02.35.05.57.71

InspectasDNV Certifiée ISO 9001-Ed 2000 N° 0116-2004-FR-cofrac6QUA.

Inspectas Certifié MASE n° N 2006-60.

Protectas Certifié MASE n° N 2006-59

Euro-Logistics est cerifiée MASE N°2006-56

EURL AU CAPITAL DE
425 180 €

N° Siret: 451 470 561 00015-APE 741 J

 

 

OPC services

(Order establishing, Leadership and Coordination)

Construction Management, covering the analysis of all the execution and construction tasks, determining the interfaces and defining construction tasks, monitoring work organisation until settlement of all outstanding issues within contractual duration.

The lead coordinator main tasks in most cases comprise three phases:

  • The design phase (which starts from the reception of the DCE and ends at contractors selection)
  • Construction works
  • Commissionning / start up phase

In the building activity, the tasks of the architect for a new building are as a minimum the “basic tasks” which comprise design to work management, from basic design until final acceptance.

In the infrastructure activity, there are no “basic tasks”. The construction manager can subcontract some parts of the work to us and also keeping some internally. The construction manager can place some tasks to the architect similar to the “basic tasks” as defined in the building activity.

OPC type of service

Construction of the BP petrol station at the Le Frontonnais lay-by on the A62 motorway.

Definition of the main steps:

  • Work contract assistance: company bid tenders, preparation before placement of subcontract orders.
  • Management of the work execution (DET) : Verification of execution documents as well as the ongoing construction.
  • Inspection Operations assistance (AOR) : Organization of the operations prior to the final inspection of the works.
  • Inspection of the works and settlement of outstanding issues
  • Weekly operations Reporting.